How Long Does a Kitchen Renovation Take? A Realistic Timeline
Blog

How Long Does a Kitchen Renovation Take? A Realistic Timeline

14 July 2026

From your first message to the final fit — what actually happens at each stage, and how long it takes.

1. First contact — same day to 24 hours

You send us your zone, budget range and timeline through the site or WhatsApp. We reply within 24 hours to talk through what you're looking for.

2. Measuring visit — usually within a week or two

Once we've spoken, we arrange a visit to your home to take exact measurements, so the design and quote fit your kitchen precisely, not an estimate.

3. Design and free quote — a few days after the visit

We put together a design and a free, no-obligation quote based on the real measurements and the materials you want. No pressure to go ahead.

4. Manufacturing — 3 to 6 weeks

Once you approve, your kitchen is built in our own factory. Straightforward kitchens are usually ready in 3–5 weeks; larger projects with bespoke cabinetry or structural changes can take 8–12 weeks in total, including fitting.

5. Installation

Our team fits the kitchen on site. A standard replacement usually takes a few days; larger villa kitchens with structural work take longer, and we'll give you a specific schedule as part of your quote.

Get started

Ready when you are

One short form, no site visit needed. Send it to us and our team takes it from there.

  • A free, no-obligation quote handled by our team
  • Designed and built in our own factory on the Costa del Sol
  • No obligation to go ahead
  • No payment until you decide to start
  • Free, no-obligation quote
  • Reply within 24 hours
  • No upfront payment

More from the blog